Search results

1 – 3 of 3
Article
Publication date: 20 November 2017

Saad Abdel-Karim El-Hamrawy, Ahmed Ebrahim Abu El-Maaty and Ahmed Yousry Akal

Quality measurement is the trigger for quality improvement. Indeed, what gets measured gets done. The real scope of quality improvement in construction projects is the difficulty…

Abstract

Purpose

Quality measurement is the trigger for quality improvement. Indeed, what gets measured gets done. The real scope of quality improvement in construction projects is the difficulty and-maybe-lack of quality measurement methods. The purpose of this paper is to identify the factors influencing the quality performance of highway projects in Egypt. Furthermore, this paper also contributes to develop models to measure the quality level of these projects.

Design/methodology/approach

A literature review is conducted to compile a list of factors influencing the quality of highway projects. The resulting list of factors is subjected to a questionnaire survey which was sent to owners, consultants and contractors of highway projects in Egypt. Furthermore, linear regression analysis and statistical fuzzy approaches are adopted for modeling process.

Findings

The survey results show that availability of experienced staff in the owner’s and contractor’s teams during the project execution, asphalt quality and type used in the construction process, pavement is not designed according to the regional conditions, and contractor’s labors and equipment capability are among the most important factors influencing quality performance.

Originality/value

The main contribution of this study is to develop models to measure the quality of highway projects in Egypt. The first model is based on the linear regression analysis, while the second one is based on a statistical fuzzy approach which is a hybrid approach from the fuzzy logic and regression analysis. Validation of the models reveals that the linear regression and the statistical fuzzy models can accurately assess expected quality of any future highway projects at confidence levels 68.97 and 87.44 percent, respectively.

Details

Engineering, Construction and Architectural Management, vol. 24 no. 6
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 18 September 2017

Ahmed Ebrahim Abu El-Maaty, Amr M. El-Kholy and Ahmed Yousry Akal

Modeling represents the art of translating problems from an application area into tractable mathematical formulations whose theoretical and numerical analysis provides insight…

Abstract

Purpose

Modeling represents the art of translating problems from an application area into tractable mathematical formulations whose theoretical and numerical analysis provides insight, answers and guidance useful for the originating application. The purpose of this paper is to determine the causal causes of schedule overrun and cost escalation of highway projects in Egypt in order to be used as independents variables in mathematical models for predicting the percentages of schedule overrun and cost escalation of such projects in Egypt.

Design/methodology/approach

A survey of a randomly selected samples yielded responses from 40 owners, 15 consultants and 56 contractors. The survey includes 38 schedule overrun factors and 26 cost escalation factors. The effectiveness degree of the identified factors has been identified by the triangle fuzzy approach.

Findings

The results of the survey show that “contractor’s technical staff is insufficient and ineligible to accomplish the project” is the most important cause of schedule overrun, while the major cause of cost escalation is inadequate preparation of the project concerning planning and execution.

Originality/value

The main contribution of this study is predicting the percentages of schedule overrun and cost escalation of highway projects in Egypt. Through the application of the linear regression analysis method and statistical fuzzy theory, four predictive models have been developed and it has been noted that the linear regression-based model shows prediction accuracy better than statistical fuzzy-based model in predicting percentages of schedule overrun and cost escalation.

Details

Engineering, Construction and Architectural Management, vol. 24 no. 5
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 24 November 2022

Ning Huang, Qiang Du, Patrick X.W. Zou and Youdan Huang

This study aims to analyze the interaction and key factors within the network of factors influencing the success of green highway projects.

275

Abstract

Purpose

This study aims to analyze the interaction and key factors within the network of factors influencing the success of green highway projects.

Design/methodology/approach

Through literature review and interviews with experienced project managers, this study identified 33 influencing factors from the perspectives of stakeholders and life cycle. The interaction between these influencing factors was determined by surveying different experts, most of whom have participated in green highway projects in China. Then, social network analysis (SNA) was used to explore the impact and control ability of different factors.

Findings

According to the prioritization of these factors, the results showed that some key factors were identified, especially incremental cost, lack of standards and regulations, development of innovative technologies and materials, public awareness and environmental protection behavior. Finally, some meaningful suggestions were put forward for different influencing factors of green highway projects.

Research limitations/implications

While the key influencing factors of the green highway projects have been identified by considering the interrelationships between different factors, the specific influencing paths and levels of different factors are not analyzed, more studies and methods should be conducted on this area in the future.

Practical implications

This finding of factors influencing the success of green highway projects which is useful for managers to overcome various obstacles encountered in similar projects. Moreover, considering the interaction among the influencing factors enables managers to make systematic and efficient decisions.

Social implications

Developing green highways have been perceived as a major innovation to help achieve the synergy of environmental protection, economic development and social responsibility. Studying the key factors influencing the success of green highway projects and putting forward targeted suggestions are crucial for promoting the environmental protection transformation of highway construction.

Originality/value

Compared with most studies on the identification of key influencing factors of construction projects, this research emphasized the interaction between different factors within the system in the analysis process. The findings could provide useful references to promote the successful implementation of green highway projects.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 8
Type: Research Article
ISSN: 0969-9988

Keywords

1 – 3 of 3